Introduction -

Tuff Coat Epoxy Primer MIO is designed for use on steel surfaces for offering superior performance in highly corrosive chemical environment. The base component contains epoxy groups which reacts with amine hardeners based on polyamides Hardener to get tough, irreversible Thermoset film at an ambient or elevated temperature. To get more anticorrosive properties zinc chrome or zinc phosphate is in corporate in base. It can be over coated with Epoxy, Chloro rubber paint and PU topcoats.

THE RANGE OF APPLICATION
Epoxy Primer is undercoat for Polyurethane, Epoxy and Rubber paints, for various Fertilizer Industries, Refineries, Chemical Plants, Food & Pharmaceutical Industries, Storage Tanks, Pipelines and Structural Steel work. This system is also useful for maintenance coatings. Resistance to Oils, Alcohol’s, Fats, Solvents and Water gives wide range of application in chemical plants. Good electrical properties give application in panel work.


KEY PROPERTIES
1. Cold curing & baking both systems are possible.
2. Excellent adhesion.
3. Withstand up to 300° C dry heat.
4. Good Mechanical Strength.
5. Gives good adhesion to topcoat of various paints.
6. Unaffected by oil, grease and aliphatic and solvents, acid and alkalis.
7. Limited Resistance to ketonic Solvent.
8. Good Electrical Properties.

PRODUCT DATA
Type Two packs cold cured or at elevated temp curing
Base :
Hardener
Based on Epoxy resin with main pigment MIO.
Polyamide base resin.
Mixing Ratio Base: Hardener 4: 1
Pot life at 30 - 35° C 4 to 6 hours after mixing.
Individual shelf life Up to 12 months as long as the sealed containers are kept under cover in dry place.
Application By Brush, Roller, Airless and conventional Spray
% NVM of the system 76-85 %
Recommended DFT 85-125 microns per coat.
Covering /Spreading Rate 4-5.5 sq. miter / liter
Drying Time Touch Dry 30 - 45 minutes
Dry to Handle 4 to 6 hrs.
Hard Dry Overnight
Complete Cure time 6 to 7 days.
Dry Heat Resistance Up to 300° C
Colour Red Oxide
Over coating Interval minimum Overnight, maximum 5 -6 days
Flash Point Above 22° C
Thinner TC/EP 101 or EP -102
Finish Matt to Eggshell and smooth
Packing 20 liters, 10 liters, and 4 liters
Salt Spray (5% NaCl) 400 hrs.

APPLICATION -

Before application of Epoxy MIO primer, do all necessary pretreatment of the job. For M. S. surface, remove all grease, oil and other contamination by using proper degreasing chemical. Blast clean the surface for heavy rusting or remove with de-rusting chemicals to clean the surface. The surface should be clean and dry before application. Stir base thoroughly and then mix four parts base and one part hardener by volume to uniform consistency. Give 30 minutes stabilization period to the mix. And then again stir before application.
For brushing if viscosity is higher than 60-80 sec then only add Epoxy thinner to get proper viscosity. It helps to get proper DFT. Use 10 to 15 % Epoxy thinner for conventional spray. For galvanized iron and aluminum use TC Etch Primer before application of Epoxy MIO Primer.

Mix the quantity perfect in ratio. Do not mix excess material, as the pot life of mix is 4 hours only. Do not apply when temperature falls below 12° C or relative humidity rises above 90% or during rain, fog or mist. Brushes and spray equipments should be cleaned properly after application; using Epoxy Thinner otherwise equipment is liable to be damaged.


MIO Epoxy Primer

Go Back to - Home / Products

Introduction -

Tuff Coat Epoxy Primer MIO is designed for use on steel surfaces for offering superior performance in highly corrosive chemical environment. The base component contains epoxy groups which reacts with amine hardeners based on polyamides Hardener to get tough, irreversible Thermoset film at an ambient or elevated temperature. To get more anticorrosive properties zinc chrome or zinc phosphate is in corporate in base. It can be over coated with Epoxy, Chloro rubber paint and PU topcoats.

THE RANGE OF APPLICATION
Epoxy Primer is undercoat for Polyurethane, Epoxy and Rubber paints, for various Fertilizer Industries, Refineries, Chemical Plants, Food & Pharmaceutical Industries, Storage Tanks, Pipelines and Structural Steel work. This system is also useful for maintenance coatings. Resistance to Oils, Alcohol’s, Fats, Solvents and Water gives wide range of application in chemical plants. Good electrical properties give application in panel work.


KEY PROPERTIES
1. Cold curing & baking both systems are possible.
2. Excellent adhesion.
3. Withstand up to 120° C dry heat.
4. Good mechanical strength.
5. Gives good adhesion to topcoat of various paints.
6. Unaffected by oil, grease and aliphatic and solvents, acid and alkalis.
7. Limited resistance to ketonic solvent.
8. Good electrical properties.

PRODUCT DATA
Type Two packs cold cured or at elevated temp curing
Base :
Hardener
Based on Epoxy resin with main pigment MIO.
Polyamide base resin.
Mixing Ratio Base: Hardener 4: 1
Pot life at 30 - 35° C 4 to 6 hours after mixing.
Individual shelf life Up to 12 months as long as the sealed containers are kept under cover in dry place.
Application By Brush, Roller, Airless and conventional Spray
% NVM of the system 55- 58 %
Recommended DFT 25-35 microns per coat.
Covering /Spreading Rate 10.5 – 14.5 sq. miter / liter
Drying Time Touch Dry 30 - 45 minutes
Dry to Handle 4 to 6 hrs.
Hard Dry Overnight
Complete Cure time 6 to 7 days.
Dry Heat Resistance Up to 120° C
Colour Red Oxide
Over coating Interval minimum Overnight, maximum 5 -6 days
Flash Point Above 22° C
Thinner TC/EP 101 or EP -102
Finish Matt to Eggshell and smooth
Packing 20 liters, 10 liters, and 4 liters
Salt Spray (5% NaCl) 400 hrs.

APPLICATION -

Before application of Epoxy MIO primer, do all necessary pretreatment of the job. For M. S. surface, remove all grease, oil and other contamination by using proper degreasing chemical. Blast clean the surface for heavy rusting or remove with de-rusting chemicals to clean the surface. The surface should be clean and dry before application. Stir base thoroughly and then mix four parts base and one part hardener by volume to uniform consistency. Give 30 minutes stabilization period to the mix. And then again stir before application.
For brushing if viscosity is higher than 60-80 sec then only add Epoxy thinner to get proper viscosity. It helps to get proper DFT. Use 10 to 15 % Epoxy thinner for conventional spray. For galvanized iron and aluminum use TC Etch Primer before application of Epoxy MIO Primer. Mix the quantity perfect in ratio. Do not mix excess material, as the pot life of mix is 4 hours only. Do not apply when temperature falls below 12° C or relative humidity rises above 90% or during rain, fog or mist. Brushes and spray equipments should be cleaned properly after application; using Epoxy Thinner otherwise equipment is liable to be damaged.

Reach us

Contact Details

Tuff Coat Polymers Pvt. Ltd.

Sr. No. 143/1, Umed Building, B - Wing, Flat No. B - 102, Lagad Mala, Sinhagad Road, Dhayari, Taluka Haveli, Behind Surya Electronic, Pune – 411041

Sales: +91 96045 12297 / +91 81498 31297

Purchase: +91 98814 08404

Accounts: +91 99212 40404

Click here to SEND YOUR ENQUIRY